                      OSIJ. Contracting the Rock Cutting. In case there  is rock cutting,'
                   or blastiiif; to he done  tlie engineer may let the .same by tender, and liave
                   the  cont apportioned among  tiie  respective owners according  to  tiieir
                   interests, and payments made as provided in previous section,s.
                       4»54. Owners Using Ditch. Owners desiring to use such ditch in
                   wliicli to (h'ain hinds not contemplated by the original proceedings must
                   do so only upon an agreement or an award.
                      <»55. Deepening or Covering Ditches. The proceedings to be taken
                   for the deepening, widening, or covering of a ditch shall Ix; the .same as for
                   the construction of a ditch.
                      No ditch shall be covered, unless when covered it will provide capacity
                   for all the sui'face and other water from lands and roads di-aininj; naturally
                   towards and into it, as well as for the water of all the lands made lial)le
                   for its construction.
                      The maintenance of ditches widened, deepened, or covered .shall bf in
                   such proportion as was provided in the original award.
                       ami. Enforcing Maintenance.  If any owner neglects to maintain
                   the portion of a ditch provided by the awaril, any of the owners who
                   were parties to the award whose lands are affected by the ditch may, in
                   writing, notify the owner thus making default to have his portion put in
                   repair within thirty days from the receipt of such notice.  And if not so
                   completed within thirty days they may apply to the engineer, who will
                   enforce compliance, as in case of the non-performance of the construction
                   of a ditch previously mentioned.
                       051. Ditches Previously Constructed. Any one interested in any
                   ditch which has not been constructed under any Act relating to drainage
                   woi'k, may take proceedings for the deepening, widening, extending or
                   covering of such ditch  in the same manner as for the construction of a
                   ditch under this Act.  The extent and costs of the work, however, nuist
                   not exceed the linjitations imposed by this Act.
                       058. Reconsideration of Agreement. Any owner who was a party
                   to the agreement or award whose lands are affected by a ditch may, after
                                                                                      'If,'
                   two years from  the completion of the construction  thereof, or in case
                   of a covered drain at any time after one year, take proceedings for the
                   reconsideration of the agreement or award under which it was constructed.
                   The proceedings would be the same in all respects as for the construction
                   of the ditch.
                       But in case of a ditch that proves insufficient, .so as to cause an over-
                   flow of water upon lands along the said ditch and thereby causes damage
                   to the .same, the award may be reconsidered within six months instead of
                   the time previously mentioned.
                       05S>. Engineer's Liability. An engineer who  wilfully  neglects  to
                    make an inspection  witliin thirty days after he has received a written
                   notice to inspect shall be liable to a fine of not less than $5, nor more than  ! .,',
                   $10, to be recovered with costs on a complaint before a justice of the peace.